Enter your keyword

VA Desalination System

VA Desalination System

IN Construction, Engineering, Procurement, WTP
Investor Name:
VOEST ALPINE Oil Field Division
Published Date:
September 22, 1994
Location:
Libya/Camp Benghazi
Value:
XX,XXX,XXX $
Architecture:
About Project

Narrative description of Project:

VOEST ALPINE intended to construct a complete new containerized RO desalination system and utilities distribution system for the oil field camp in Benghazi. Works for the water treatment as specified in the Contract and which is reasonably required for the establishment on operable efficiency. The scope of the project was the basic-/ detailed engineering and supply of a containerized reverse osmosis system comprising raw water storage tank incl. pumping station, pre-chlorination, sand and activated carbon filtration incl. backwashing system, acid- and Antiscalant dosing stations, high pressure pumping station, reverse osmosis desalination system, final disinfection, full set of instruments, , complete set of analytical instruments, compressor station and service water pumping station, electric LV panels, MCC, MCP, Mimic Diagram, supervision for erection/commissioning- and 2 years spares. to produce potable water.

Fields of Specialisation:

The Contractor had thoroughly to study the project, and also possess the necessary know-how technology, capability, skills, competence, experience and qualified specialists in the field of potable water treatment for remote area camps.

Description of actual services provided by staff within the assignment:

 Basic Engineering
 P&ID, PFD, Plant Layout incl. main equipment – 2D
 Process Design and -description
 Equipment List
 Pipe List/- Valve List/- Instrument List/-Specification
 Power Consumption List
 Chemical Consumption List
 Delivery of mechanical/electrical equipment
 Supervision of erection
 Commissioning
 Project management